FIRE REMEDIATION

In the wake of the demand driven by Government and the Developers Remediation Contract, we have experience and growing expertise in best methods of how to best achieve your EWS1 and regulatory sign off.

 

Working as either principal contractor or subcontractor, we carry out the following:

​

​​​We understand that in most cases the buildings are occupied, and that the work must be carried out in accordance with full regulatory approval, yet also the most cost effective method.

Construction Site Inspection_edited.jpg

INVESTIGATIONS

Either under a PCSA, or as a stand alone order, we help conduct intrusive surveys to help identify non-compliant materials and fire-stopping failures. With the help of the fire engineer, we ensure we only strip and replace what is absolutely necessary to minimise costs for the FRAEW report to be produced.

 

Our works can include:

​

      Access/Scaffold Strategy

      Methodology of Delivery

      Pre-condition Surveys

      Scaffold Licence 

      Highway License

shutterstock_422712733_edited.jpg

DESIGN & SPECIFICATIONS

Partnering with our specialist team below, we offer design fully complain to remediation strategy to meeting building regulations and achieve your EWS1 certification:

 

      Principal Designer

      Architectural 

      Specialist Facade Engineering

      Specialist Manufactures 

      Fire Engineer

      Structural Engineer

      3d Modelling

Gemini_Generated_Image_2n75r22n75r22n75_edited.jpg

GOLDEN THREAD

We maintain a transparent and compliant digital record of all materials, testing data, and installation methodologies. This ensures you are handed the complete, legally required trail of building information upon completion.

 

These deliverables include:

 

      As-built architectural drawings

      O&M manuals

      Material warranties and fire test certifications

      Photographic evidence of concealed installations (through           One Trace)

       Product data sheets for all A1/A2 materials

AdobeStock_207515591_edited.jpg

BSR SUBMISSION 

We manage these critical submissions alongside the principal designer, handling the intricate documentation needed for High-Risk Buildings (HRBs) to achieve approval from the regulator.

​

      These works can include:

      Gateway 2 & 3 application support

      Building Control body coordination

      Construction Control Plan management

      Change control logs and recording

      Final compliance declarations

Legal Handshake_edited.jpg

RLO (RESIDENT LIAISON)

In most cases these buildings remain occupied during remediation. Our dedicated Resident Liaison Officers maintain clear, empathetic communication with leaseholders and tenants, minimising friction and ensuring smooth daily operations while they remain safely in their homes.

​

      These services include:

      Dedicated on-site Resident Liaison Officer

      Weekly resident newsletters and progress updates

      Meetings and drop-in sessions

      24/7 out-of-hours emergency contact

IMG_0343_edited.jpg

EXTERNAL WALLS

Leveraging our facade expertise, we safely strip combustible materials, replacing them with fully certified, non-combustible systems. Our approach ensures minimal disruption to the building fabric while maximising thermal and fire performance.

​

These works can include:

​

      Combustible material strip-out and safe disposal

      Rainscreen cladding and EWI replacement

      Cavity barrier installation and inspection

      Insulation replacement (A1/A2 rated)

      Weatherproofing and structural backing board replacement

​

AliDeck-Aluminium-Balcony-Decking_edited.jpg

DECKING

We remove non-compliant timber and composite balcony decking, and replace with, A-rated aluminum support subframes and boards. This eliminates exterior fire pathways while upgrading the aesthetic and lifespan of the balconies.

​

These works can include:

​

      Balcony condition surveys

      Strip-out of combustible decking and joists

      Installation of A1/A2 rated aluminium decking

      Non-combustible subframes and adjustable pedestals

      Drainage and waterproofing integration

​

GOOD12_edited.jpg

INTERNAL WALLS

In accordance with the fire plan, and if deemed necessary, we can restore crucial fire compartmentation that is essential to building safety. This can include fire-stopping to service voids, risers, and internal partitions to prevent the spread of smoke and flame between apartments and communal areas.

 

      Compartmentation surveys and reporting

      Fire-stopping of MEP service penetrations

      Riser shaft remediation

      Intumescent sealing and batts

      Upgrades to structural compartment walls

Door Knob_edited.jpg

FIRE DOORS

Whether for flat entrances or communal corridors, we install the components deemed necessary to achieve the upgrade and certificate. All components are installed and rigorously checked, and signed off to meet current regulations upon handover.

​

These works can include:

​

      FD30S & FD60S door installations

      Flat entrance door replacements

      Linear seal replacements.

      Communal corridor and stairwell door upgrades

      Upgrades to ironmongery, intumescent strips, and cold smoke         seals